CONSTRUCTION OF A ΒΙΟLOGICAL RAISIN STORAGE BUILDING 1.552,26 m2 WITH Α SERVICE PASSAGEWAY 84,16 m2
THE CHALLENGES
General excavation and dredging, foundation of reinforced concrete beams, industrial flooring, heavy duty special metal constructions, sliding and roofing with polyurethane-insulated metallic sheets, fireproof paint, industrial electric-powered rolls, grounding, electromechanical installations, industrial internal lighting.
PROJECT DETAILS
Categories: | |
Client: | AGRICULTURAL COOPERATIVES UNION AEGHION S.A. |
Location: | AIGIO, GREECE |
Completed: | 2015 |
Value: | 392.700,00€ |