SHORE CONNECTION SYSTEM FOR THE ELECTRICAL POWER SUPPLY OF THE PARKED SHIPS (“ELEMED” EUROPEAN PROGRAM )
THE CHALLENGES
Construction of power grid infrastructure, concrete constructions, construction of electronic installations building, construction of 500kVA MV/LV power substation, isolation transformer installation, construction of ship power supply system (CABLE MANAGEMENT SYSTEM) uninterruptible power supply (UPS), electronic equipment installation (installation of 400V / 50Hz and 440V / 60Hz 500kVA inverter, and remote control system using PLC & SCADA)
PROJECT DETAILS
Categories: | |
Client: | HARBOR FUND OF THE PORT OF KILLINI |
Location: | PORT OF KILLINI |
Completed: | 2018 |
Value: | 456.854,84€ |