REPLACEMENT OF THE CENTRAL PUBLIC WATER SUPPLY DUCT BETWEEN “TSIPOS” QUARRY AT LITHAKIA VILLAGE AND CENTRAL TANK OF ZAKYNTHOS AT BOCHALI VILLAGE (DUCT D2 – D3)
THE CHALLENGES
Underground trench excavations, foundation excavations, trenches, construction of reinforced concrete wells, construction of 3rd generation DN75-DN500 polyethylene pipes grid, new connections to the existing grid, pavement restoration, local control stations and central remote control using programmable logic controllers (PLCs).
PROJECT DETAILS
Categories: | |
Client: | MUNICIPAL ENTERPRISE FOR WATER SUPPLY AND SEWERAGE of ZAKYNTHOS |
Location: | ZAKYNTHOS, GREECE |
Completed: | 2014-2016 |
Value: | 7.800.813,01€ |