SHORE CONNECTION SYSTEM FOR THE ELECTRICAL POWER SUPPLY OF THE PARKED SHIPS (“ELEMED” EUROPEAN PROGRAM )

THE CHALLENGES

Construction of power grid infrastructure, concrete constructions, construction of electronic installations building, construction of 500kVA MV/LV power substation, isolation transformer installation, construction of ship power supply system (CABLE MANAGEMENT SYSTEM) uninterruptible power supply (UPS), electronic equipment installation (installation of 400V / 50Hz and 440V / 60Hz 500kVA inverter, and remote control system using PLC & SCADA)

PROJECT DETAILS

Categories:
Client: HARBOR FUND OF THE PORT OF KILLINI
Location: PORT OF KILLINI
Completed: 2018
Value: 456.854,84€