WORKS FOR THE ENERGY UPGRADE OF THE “AGAPIS MELATHRON – O AGIOS CHARALAMPOS” BUILDING

THE CHALLENGES

Replacement of existing heating system with a hybrid heating system by two heat pumps and diesel condensing boiler, radiators with thermostatic heads, new diesel condensing boiler for hot water production, new solar panels, replacement of existing lamps by LED lamps, new exterior aluminum frames with double glazing, supply and installation of twin (2x10kWp) photovoltaic system, epoxy resin sealant damage repair, reinforced mesh coating repairs, colorings

PROJECT DETAILS

Categories:
Client: AGAPIS MELATHRON – O AGIOS CHARALAMPOS
Location: Parodos Korinthou, 251 00 Aigio
Completed: 2017
Value: 264.516,13€

Looking for a high quality constructor for your next project?